陈志武.双侧壁导坑施工对偏压隧道初期支护变形的影响[J].现代交通技术,2007,(3):63- |
双侧壁导坑施工对偏压隧道初期支护变形的影响 |
Effect of Double Sidewall Drift on Initial Support Deformation in Deflective Pressure Tunnel |
|
DOI: |
中文关键词: 双侧壁导坑 偏压隧道 变形 |
英文关键词:double sidewall drift deflective pressure tunnel deformation |
基金项目: |
陈志武 |
中铁十八局集团有限公司,天津300222 |
摘要点击次数: 4791 |
全文下载次数: 622 |
中文摘要: |
随着交通基础设施建设的迅速发展,采用双侧壁导坑施工软弱围岩段偏压大跨径隧道的工程项目越来越广泛,笔者通过对工程实例的研究,对双侧壁导坑的施工顺序与偏压隧道初期支护变形的相关关系,进行了归纳和总结,以期为以后的工程施工提供参考。 |
英文摘要: |
With the rapid development of traffic infrastructure construction ,double sidewall drift construction is widely used in large-span deflective pressure tunnel to control the soft surrounding rock deformation. Combined with engineering practice, this paper analyses the relation of construction process and initial support deformation of deflective pressure tunnel,which could be refered to the same projects. |